CERN Logo      Collection of information on Building 180


Central beam path through building 180. (.pdf)

Maximum floor load: 30 T/m^2 on top of technical galleries and 50 T/m^2 for the remainder of the floor.

Material entrance door clearance: 6m x 20m

Overhead crane (Jura side) :

Load: 60 T

Height : xx m

Overhead crane (Meyrin side):

Load: 40 T

Height : xx m