Collection of information on Building 180
Central beam path through building 180. (.pdf)
Maximum floor load: 30 T/m^2 on top of technical galleries and 50 T/m^2 for the remainder of the floor.
Material entrance door clearance: 6m x 20m
Overhead crane (Jura side) :
Load: 60 T
Height : xx m
Overhead crane (Meyrin side):
Load: 40 T
Height : xx m
Site created by CERN Web Services on Tuesday, July 06, 2010 8:51 AM